WINDOWS 2008

On May 9, we had the fourth anniversary of dedication of our church building on May 2004.

This spring we started to do the outside of the windows. Actually the windows themselves need repainting although we repainted them two years ago. We try to do this with our own funds but it looks like that our strength is still insufficient.

We also want to complete the Sunday school rooms that are upstairs. This spring I moved in my office here in the church that until now was used as room for small children and babies. Now, the small children and babies should go in the room above my office but it is still not completed yet. In addition to this my office need repainting. So, these are our tasks:

  1. Completing the windows outside. We need to make the whole building outside but this is impossible for us at this moment. That is why we want to complete at least the windows so that the empty holes in the walls (not bankomats J) around them to be filled with lime.  For this we need 400 leva.
  2. To paint the windows outside. For this we need 150 leva.
  3. To complete the Sunday School rooms upstairs. That is difficult. It requires electrical installation, doing the walls and the ceiling. This will cost about 3000 leva.
  4. To paint my office. That’s easy. It will cost about 100 leva.
  5. To complete the front stairs and back stairs.  This will cost about 800 leva with the materials.
  6. The street door – about 300 leva.

Also, I need a car – I sold my old car for 2500 leva. Up to now we have raised 3900 leva But we still need another 4000 leva in order to buy VW Sharan – the car we need.

Please pray about these needs and if God leads you invest in us as God's servents and in God's work in Bulgaria.

Click on the picture in order to enlarge it.


This is my family - April 2008 With my disciples - April 2008 Greetings from our children Teaching theology of worship Holes in the walls around the windows
The plastir arounnd windows Protecting the windows with nilon Making form with boards Our worker Tsvetan  
Removing the wooden frame The lime Making the front door   The back windows
This one need to be done

Varna Methodist Church

Discipleship Seminar in April My new office The final result
The front door completed The final result in rare window This door should be finished The final layer 1 The final layer 2
The final layer 3 The final layer 4 The back doors to the bathrooms Windows still to be done 1 The north side not completed yet
The north side - yet to be done Front right windows Front left windows Front stairs Back Stairs
The church inside The corridore The front left door - my office The front right door - to upstairs The stair
Electical installation - still to be done This wall needs plastir The small children room - chimney The small children room - ceiling Sunday School room 1
Sunday School room 2 Sunday School room 3 Sunday School room 4 The small children room - needs door The street door needed